Okładka książki
Książka po angielsku
Practical Mechanical and Electrical Systems for Construction Managers
Opis książki
The Jobsite Reference That Answers Before the Ceiling Closes The MEP package is where commercial projects lose their schedules. A duct rerouted around a beam becomes a sprinkler obstruction. A fixture moved eighteen inches exceeds a trap arm limit. A ceiling lowered for a mechanical conflict invalidates a hydraulic calculation. None of these consequences appears on the drawing where the change was made, and each surfaces months later, when correcting it costs a ceiling, a change order, or a certificate of occupancy. This reference is written for the construction manager who runs mechanical, electrical, plumbing, and fire protection packages without having designed them. It covers every system in the building and the interfaces between them - in plain, second-person language, grounded in congested voids, late architectural changes, rejected submittals, and acceptance tests that fail on the first attempt. Every chapter closes with field checklists you can act on the same day. Inside this reference: - Air systems, ductwork, static pressure budgets, and why a branch reads short- Electrical distribution, feeders, conduit fill, grounding, bonding, and fault current- Domestic water, drainage, venting, and the trap arm limit that causes odor complaints- Sprinkler design density, head spacing, obstruction rules, fire pumps, and standpipes- Fire alarm detection, notification, and the supervisory signals nobody wires- Building automation, sequences of operations, and the points list that settles scope- Life-safety interfaces - dampers, duct detectors, elevator recall, shunt trip- Commissioning, functional testing, TAB reports, and warranty administration An ebook edition is included, giving you searchable text and the full figure set on any device you can carry into a ceiling void. Buy now and stop discovering MEP problems after the drywall goes up. The conflict you catch this week is the one that never becomes a change order, a failed inspection, or a delayed opening - and the next coordination meeting is where you will start using it.BR
- ISBN-13
- 9798166112330
- Język
- Angielski
- Waga
- 1 338 g
- Oprawa
- Miękka
- Wydawnictwo
- Independently Published
- Liczba stron
- 586
- Rok wydania
- 2026
- Kategoria
- Nieprzypisana
Termin wysyłki jest obecnie niedostępny.
Wszystkie podane terminy wysyłki liczymy w dniach roboczych.